SHANGHAI SHIPYARD (MAJOR SHIPREPAIR AGENTS)
in China
Slip Way
Nr |
Name |
L. (m) |
W(m) |
|---|---|---|---|
1 |
Slipway in ChongmingIsland |
300 |
46 |
Dock
Nr |
Name |
L(m) |
W(m) |
Depth(m) |
Lifting capacity (T) |
|---|---|---|---|---|---|
1 |
Dry Dock 2# |
262 |
44 |
10.9 |
|
2 |
Dry Dock 2# |
205 |
36 |
10.4 |
|
3 |
BAI YUN SHANG Floating Dock |
190 |
26.9 |
13 |
11,500 |
4 |
XIN XIANG SHEN Floating Dock |
245 |
51/39.4 |
15.3 |
25,000 |
5 |
HAI HUA Floating Dock |
192 |
40.5/29 |
14.4 |
12,000 |
Quay
Nr?m) |
Name |
Length?m? |
|---|---|---|
1 |
Chongming Shipbuilding Outfitting Quay |
860 |
2 |
Puxi Solid Quay |
259 |
3 |
Chongming Ship Repairing Dock |
750 |
Shipbuilding And Repairing Lifting Equipment
Nr |
Name |
SWT?t? |
Qty |
|---|---|---|---|
1 |
Gantry Crane |
150 |
4 |
2 |
Gantry Crane |
120 |
2 |
3 |
Gantry Crane |
100 |
2 |
4 |
Gantry Crane |
80 |
2 |
5 |
Gantry Crane |
40 and below |
several |
Block Assembly Area
Nr |
Name |
Area?m2? |
|---|---|---|
1 |
Shipbuilding Cutting & Machinery Area |
56995 |
2 |
Block Assembly Area |
69306 |
3 |
Indoor Painting Area |
10715 |

Download our brochure